Summary
WFP Afghanistan installed solar power systems in its Herat, Faizabad, and Mazar Area Offices to combat electricity shortages and reliance on diesel generators. These projects aimed to ensure a continuous power supply and significantly reduce operational costs.
Content
WFP Afghanistan installed solar power systems in its Herat, Faizabad, and Mazar Area Offices to combat electricity shortages and reliance on diesel generators. These projects aimed to ensure a continuous power supply and significantly reduce operational costs.
Sources
Logistics Cluster, WFPThis document is attached to:
Countries
Activities
Download this document
(158.23 KB - PDF - Revised on: 2025-07-25)