Document

Réhabilitation de la route Lwambo-Mitwaba

Summary

Progress report on the Lwambo-Mitwaba Road Rehabilitation project (01 July - 30 September 2007). Aims to restore access, support humanitarian efforts, and create jobs for local communities. Prepared by UNOPS, October 2007.

Source

Logistics Cluster
Download this document (102.9 KB - PDF - Revised on: 2007-10-26)

This document is attached to:

Activities

Download this document (102.9 KB - PDF - Revised on: 2007-10-26)