Summary
Content
5 /12/05
1. Starting point: Rawala Kot (Gas Station PSO - entry point)
| Hour: | 11:40 |
| Elevation: | 1631 meters above sea level |
| Coordinates: | UTM: 43 S-0384901 3748388 Lat: 33° 52.174' Long: 73° 45.331' |
Direction: North to North-West
2. Road Rawala Kot - Arja
| Surface: | Alternating asphalt and concrete |
| Condition: | Fair to Good |
| Vehicle: | Any |
| Hazards: | NTR |
3. Bridge Crossing
| Assessment: | The crossing lies at the end of this track (Arja), over Mahl River. The bridge is made of iron and cement and shows no apparent sign of damage. |
| Hour: | 12.50 (H + 70 minutes) |
| Elevation: | 780 meters above sea level |
| Coordinates: | UTM: 43 S - 0375763 3759915 Lat: 33° 58.306' Long: 73° 39.381' |
Direction: East
4. Road Arja - Bagh
| Surface: | Asphalt |
| Condition: | Good, in some points some land slides have occurred and repair is underway, care of NATO troops |
| Vehicle: | Any |
| Hazards: | NTR |
5. Arrival point: Bagh Base Camp
| Hour: | 13.40 (H + 120 minutes) |
| Elevation: | 1174 meters above sea level |
| Coordinates: | UTM: 43 S - 0388305 3760120 Lat: 33° 58.545' Long: 73° 47.452' |