Document

Nine Steps to developing an ICS strategy and work-plan 2/4

Summary

This guidance document titled 'Logistics Preparedness Project (FBPP): Nine Steps to Develop an ICS Strategy and Workplan' was updated in June 2021. It outlines effective strategies for institutional capacity strengthening in humanitarian logistics through nine structured steps.

Source

Field-Based Preparedness Project
Download this document (343.82 KB - PDF)

This document is attached to:

Activities

Download this document (343.82 KB - PDF)