PINNED DOCUMENT

Mosul Dam Mission Report - 30 March 2017

Summary

This is the 2nd Mosul Dam Mission Report dated 30.03.2017, detailing emergency preparedness assessments by the Logistics Cluster and WFP, addressing dam safety, repairs, and operational status, while recommending ongoing monitoring and emergency planning for potential dam failures.

Source

Logistics Cluster
Download this document (973.1 KB - PDF - Revised on: 2017-04-10)

This document is attached to:

Countries

Activities

Iraq - Archived

Download this document (973.1 KB - PDF - Revised on: 2017-04-10)