Air Operations/NFI pipeline
Air Operations
The passenger aircraft fleet now stands at 3 Beechcraft (18 seater), 3 Cessna Caravans and 1 DHC-8 (36 seater).
The Belgian Airforce C-130 and AN-12 continue to deliver NFI to Darfur. The Belgium C-130 is due to cease operations on 12 Oct. The other AN-12 that was grounded due to crew duty limitations is now operational again. This AN-12 and the Belgium funded C-130 are therefore serving El Geneina at maximum capacity.
WFP Humanitarian Air Services (HAS) has also made available two IL-76 and one AN-12 to help with the back log of cargo. The IL-76 aircraft came on line on Monday and started to serve El Fasher and Nyala. Unfortunately the AN-12 is still awaiting GoS clearance
The backlog to El Geneina and El Fasher has reduced to 7 days. It is anticipated that all back-logged cargo to these two locations will be delivered by Thursday 7 October.
WFP-HAS now has four helicopters under the based in Nyala (3) and El Fasher (1). The fourth helicopter will start operating from Nyala this week.
El Fasher Airport is open and functioning. The official hours are from 08h00 a.m. to 18h30 p.m.
Nyala Airport is open again but construction with the apron extension ongoing. It was closed on the 5 Oct for some hours due to rain. Four Il-76 flights landed over the past week with minor offloading problems.
The problem of securing adequate jet fuel in El Obeid re-surfaced this week because of delays in deliveries to the field. The WFP Country Office is holding discussions with Shell and Matthew Petroleum to obtain the required amounts of jet fuel.
Agencies are still late in submitting projections for the coming months and this is hampering planning for any additional assets. Agencies are requested to forward NFI projections to UNJLC asap. The format to provide this information in can be downloaded from the UNJLC website at http://www.unjlc.org/content/index.phtml/itemId/14868 .
All cargo is to be ready at the airfield in time to be loaded and manifested. WFP will be requested to position food as stand-by cargo to the warehouse at Khartoum Airport. Neither water nor diesel will be transported from Khartoum into the field, provided it is available on the market at the state capitals.
Agencies are reminded that regular updates with regards to the NFI service will be posted on the UNJLC website www.unjlc.org.
Common NFI Pipeline
UNJLC is assisting UNOCHA in managing a Common NFI Pipeline to Darfur. The table below details the donations to the Common NFI Pipeline in the past and coming weeks:
|
Date |
Commodity |
Number |
Donor |
|
3 – 5 Oct |
plastic sheets |
10,000 |
USAID |
|
3 – 5 Oct |
blankets |
10,000 |
USAID |
|
10 Oct |
blankets |
30,000 |
USAID |
|
11 Oct |
mosquito nets |
14,000 |
WVI |
The table below details the requirements, stocks and forecast quantities of each of the NFI commodities for Darfur since the Common NFI Pipeline programme commenced five months ago.
The Distribution per item per household is as follows:lankets-2, jerrycans-1, mosquito nets-1, plastic sheets-1, soap-1Kg per month, bucket/lid-2, women clothing-1, plastic sleeping mat-2, sanitary material-4.
For clarifying below sheet, here is an example how to read the information on blankets:
Out of an overall target figure of 612,052 blankets (2 blankets for 306,026 households) 352,270 blankets have been distributed through the common pipeline or other pipelines. To meet the overall target figure, 259,782 more blankets still have to be distributed.
In the three Darfurs, 65,574 blankets are currently in stock. Out of these, it is planned to distribute 16,808 blankets over the next 4 weeks. The remaining stock after this planned distribution without additional input of blankets will be 48,766 blankets.
Additional blankets in the pipeline with an ETA within the next 4 weeks are 30,000 blankets.
The overall figure of blankets already distributed, in stock and to arrive within the next 4 weeks is 447,844 blankets. The remaining supply needs to achieve the target figure of 612,052 blankets is therefore 164,208 blankets.
The sheet below is constantly updated in order to provide an accurate picture of NFI distribution, available stocks, existing pipeline and the requirements to cover the needs of the target population.
|
Requirement |
Stock at Location |
||||||
|
Commodities |
Target |
Already distributed from CP/OP |
In % |
Remaining |
In Stock |
4 Weeks distribution plan |
Remaining Stock |
|
Blankets |
612,052 |
352,270 |
57.6% |
259,782 |
65,574 |
16,808 |
48,766 |
|
Jerrycan 10l - 20l |
306,026 |
146,596 |
47.9% |
159,430 |
96,115 |
13,827 |
82,288 |
|
Mosquito Nets |
306,026 |
8,150 |
2.7% |
297,876 |
16,055 |
0 |
16,055 |
|
Plastic Sheet 4X5M |
306,026 |
182,416 |
59.6% |
123,610 |
47,717 |
8,404 |
39,313 |
|
Soap (Kg) |
306,026 |
0 |
0.0% |
225,317 |
371,061 |
15,353 |
355,708 |
|
Bucket w. lid, 20l |
612,052 |
5,637 |
0.9% |
531,344 |
79,650 |
0 |
79,650 |
|
Clothing |
306,026 |
5,300 |
1.7% |
300,726 |
114,400 |
0 |
114,400 |
|
Plastic sleeping mats |
612,052 |
0 |
0.0% |
773,470 |
10,909 |
0 |
10,909 |
|
Sanitary material |
1,224,105 |
0 |
0.0% |
1,224,105 |
2,492 |
0 |
2,492 |
|
Pipeline |
|
|
|
ETA Available |
Distributed + Stock + Pipeline |
Outstanding Supplies |
|
30,000 |
447,844 |
164,208 |
|
0 |
242,711 |
63,315 |
|
14,000 |
38,205 |
267,821 |
|
0 |
230,133 |
75,893 |
|
0 |
371,061 |
-145,744 |
|
|
85,287 |
451,694 |
|
|
119,700 |
186,326 |
|
12 |
10,921 |
762,549 |
|
0 |
2,492 |
1,221,613 |
Figures are based on 1,400,000 IDP’s
NFI Cargo
UNJLC supports and tracks the air movement within Sudan of non-food items used to support relief operations but which are not distributed to IDPs. This programme began on the 21st of August and is known as the NFI Cargo programme.
UNJLC would like to remind all users of the following priorities for Air Cargo
|
Priority 1: |
Medical cases / security relocation |
|
Priority 2a: |
Interagency communication and IT equipment for MOSS compliancy |
|
Priority 2b: |
Communication and IT equipment |
|
Priority 3: |
NFIs, Shelter material, Sanitation and water equipment |
|
Priority 4: |
Generators, Vehicles, Staff support, Spare parts |
|
Priority 5: |
Programme support |
|
Priority 6: |
Construction material |
|
Priority 7: |
Office supplies, furniture |
|
Priority 8: |
Fuel (as long as fuel available in local market) |
The table below details the weight of the NFI cargo that has been transported since the programme began and is broken down by the type of aircraft used.
|
NFI Weight (Kg) |
||||||
|
Status |
To |
Aircraft Type |
Grand Total |
|||
|
AN-12 |
C-130 |
IL-76 |
N/A |
|||
|
Cancelled |
FAS |
|
|
|
12,390 |
12,390 |
|
GEN |
|
|
|
61,009 |
61,009 |
|
|
KHT |
|
|
|
1,650 |
1,650 |
|
|
NYA |
|
|
|
23,362 |
23,362 |
|
|
Cancelled Total |
|
|
|
98,411 |
98,411 |
|
|
Delivered |
FAS |
33,560 |
16,863 |
|
|
50,423 |
|
GEN |
103,795 |
145,091 |
|
|
248,886 |
|
|
KHT |
13,128 |
11,980 |
|
|
25,108 |
|
|
NYA |
81,882 |
50,805 |
12,100 |
|
144,787 |
|
|
Delivered Total |
232,365 |
224,739 |
12,100 |
|
469,204 |
|
|
En-route |
FAS |
|
|
|
|
|
|
GEN |
15,084 |
3,299 |
|
|
18,383 |
|
|
KHT |
|
|
|
|
|
|
|
NYA |
|
|
21,053 |
|
21,053 |
|
|
En-route Total |
15,084 |
3,299 |
21,053 |
|
39,436 |
|
|
Manifested |
FAS |
3,600 |
|
20,228 |
|
23,828 |
|
GEN |
130,567 |
78,769 |
|
|
209,336 |
|
|
KHT |
|
|
|
|
|
|
|
NYA |
30 |
|
26,214 |
|
26,244 |
|
|
Manifested Total |
134,197 |
78,769 |
46,442 |
|
259,408 |
|
|
Not Available |
FAS |
|
|
|
13,008 |
13,008 |
|
GEN |
|
|
|
106,540 |
106,540 |
|
|
KHT |
|
|
|
|
|
|
|
NYA |
|
|
|
43,272 |
43,272 |
|
|
Not Available Total |
|
|
|
162,820 |
162,820 |
|
|
Pending |
FAS |
|
|
|
|
|
|
GEN |
|
|
|
35,030 |
35,030 |
|
|
KHT |
|
|
|
128 |
128 |
|
|
NYA |
|
|
|
|
|
|
|
Pending Total |
|
|
|
35,158 |
35,158 |
|
|
GRAND TOTAL |
381,646 |
306,807 |
79,595 |
296,389 |
1,064,437 |
|
2. Road transport and access
North Darfur:
From a point of view of physical access, all roads are accessible because it has not rained recently.
See Security section below for further information on roads closed due to security.
South Darfur:
Nyala and the surrounds received very heavy rain on Tues 5 Oct for several hours.
Accessibility problems are reported for the following:
|
Nyala – Kokum road |
A WFP security mission reported that this route is still only 4WD |
|
Um Dukhun (Wadi Salih locality) |
Accessible by helicopter only |
|
Um Dafug (Rehaid el-Berdi locality) |
Accessible by helicopter only |
|
Nertitie – Golo road |
Route now drying and more accessible. Journeys in 1 day from Nyala |
|
Kubum |
Accessible to 4WD vehicles with winches only |
|
Malaam – Rokero road |
Road now open but to 4WD vehicles only. Security is still a problem and well advanced prior notice to the authorities before travelling to this area is strongly advised |
See Security section below for further information on roads closed due to security.
West Darfur
All roads are accessible and all wadis dry.
See Security section below for further information on roads closed due to security.
3. Rail transport
Nyala Town is again on load-shedding at night and with some water restrictions as well, which would lead to the presumption that they are waiting for another re-supply by rail.
4. River transport/port operations
UNJLC is compiling available information on ports, including river ports in Sudan. This information will be made available on the UNJLC website during the coming days.
5. Storage
UNJLC has commenced a Warehouse/Storage Survey in the Darfurs. Report publication is expected in early October.
WFP food storage tents being erected this week in Golo.
6. Fuels
| Price in Sudanese Dinar per Imperial Gallon / Litre | NB : 1 IG = 4,546 Litres - Exchange rate: 1 USD = 260 SDN | |||||||
|
Fuel prices / Darfur crisis (25 Sept - 01 Oct ) |
|||||||||||
|
Khartoum
|
El Fasher
|
Nyala
|
Geneina
|
El Obeid
|
|||||||
|
IG
|
L
|
IG
|
L
|
IG
|
L
|
IG
|
L
|
IG
|
L
|
||
| Diesel | 25 Sept - 01 Oct |
345
|
76
|
650
|
143
|
640
|
141
|
1100
|
242
|
363
|
80
|
| Petrol | 25 Sept - 01 Oct |
555
|
122
|
900
|
198
|
800
|
176
|
1730
|
381
|
605
|
133
|
| Kerosene | 25 Sept - 01 Oct |
300
|
66
|
700
|
154
|
650
|
143
|
1025
|
225
|
425
|
93
|
| JetA1 | 25 Sept - 01 Oct |
330
|
73
|
782
|
172
|
650
|
143
|
638
|
140
|
368
|
81
|
At exchange rate of 1 USD = 260 SDN
North Darfur
Jet A1 is available.
No changes in prices from last week.
No new fuel stations.
South Darfur
Jet A1 is in critically short supply. AU aircraft have all been grounded due to the lack of fuel. WFP have brought in their 200 extra barrels. No update on the commercial re-supply that is still in transit from El Obeid.
The diesel price is stable and re-supply has arrived.
Cooking Gas supplies are available.
Gapco have run out of fuel but are expecting a re-supply this week.
West Darfur
Nothing new to report.
7. Security
Despite prior notification of missions to the SLA by humanitarian agencies, SLA personnel are still blocking access to certain areas and in some cases turning people back at gunpoint. This is reportedly due to problems of internal communication within the SLA.
North Darfur
The overall security situation remains tense with reports of clashes between GoS and SLA.
El Fasher – Al Tawisha and Millet – Malha roads: are NO GO areas due to continued insecurity.
Um Kadada – Koma – El Fasher road: is now a GO area.
Millet – Koma road: On 3 Oct reports indicated that armed men attacked a passenger Land Rover travelling from Millet to Koma and killed 8 people thought to be from the Zayadiya Tribe (Arab).
Um Kadada – Al Tuwaysha road: Two seniors Government officials were abducted last week by alleged insurgents when they were travelling on the road south of Um Kadada to Al Tuwaysha, the area is declared Military Zone by GoS. They were released later and flown from Abu Hemera (approx. 50 kms South of Um Kadada ) to El Fasher. There are rumours that they were released after the intervention of the CFC.
Zamzam Camp: On 28 Sep there was heightened insecurity around the Zamzam camp. Following alleged incidents of kidnap and rape, IDPs attacked police inside the camp, reportedly injuring two officers. Humanitarian agencies were advised to leave the camp by both HAC and local officials, and NGOs temporarily recalled their staff. The AU, monitoring the situation on the ground, advised the police to withdraw from the camp. The situation by the end of the day, was tense but stable. The camp is now accessible to UN Agencies and the distribution of NFI by the Spanish Red Cross resumed and was completed to all 4,314 households on 5 Oct.
Malha and Malliet towns: An NGO has pulled out of both towns after an incident in which an NGO vehicle was commandeered to transport GoS troops.
Millet town: Heavy machine gun and explosions were heard inside Millet town coming from NE Direction.
Tawila town: Following a house to house search by GoS Police on 3 Oct in Tawila town and some arrest were made on the suspicion that they were supporting the rebels. Three Police posts which were outside Tawila were redeployed in the town. UN agencies are not permitted to stay in Tawila overnight.
Kulkul village: On 3 Oct two women from Kulkul village were abducted. Both women were working at health clinics in Gabral Elganam and rural Kulkul. They are still missing.
South Darfur
The security situation in South Darfur continues to be of concern, with increased movements of military and several security incidents occurring. The UN curfew is now 10pm. The Niyala town curfew remains at 11pm.
Kass: On 1 Oct, 8km two humanitarian vehicles from Kass were ambushed and held at gunpoint by two armed men in civilian clothes. The vehicles were looted but there were no casualties. As a result, the Nyala – Kass – Zalinge road was closed for humanitarian traffic but was reopened the following day.
Kalma Camp: There has been more tension in Kalma Camp and problems between the police and IDPs.
Nyala area: has been quiet but with the increased security incidents in the Taisha area and corridor north between Taisha and Muhajaria.
Nyala – El Fasher: NO GO area and closed to UN due to continued insecurities around Manawashi and Dumma.
Nyala – Ed Dian (railway road): NO GO area apart from route to Marla, Sanu A fundu. This road will continue to be monitored due to the insecurities to the north towards Muhajaria.
Nyala – Sanam El Naga – Gerieda: Road open and now GO area, however regular updates are required from the NGOs.
Nyala – Ed Dian (via Muhajaria): this route is still being used by commercial transporters, and some international NGOs.
Jebel Mara (Eastern side): Insecurity continues in this area, particularly with the ongoing nomadic migration. This is also affecting Western Jebel Mara.
Jebel Mara (Western side): Situation in the area around Guildo and Golo continues to be tense.
West Darfur
The situation in El Geneina, West Darfur remains calm as does the majority of the state, with only minor incidents being reported.
El Geneina – Masterei road: NO GO area for 4 days while UNSECOORD assesses.
8. Other:
Logistics Planning Map
UNJLC has distributed the first 50 copies of its Logistics Planning Map to OLS members in Nairobi. A modified version has also been sent to Khartoum for printing and distribution to Agencies operating in the North. A second draft of the product is expected in early November and will include the GPS tracking results from the UNJLC Darfur road survey.
Hard copies of UNJLC’s main reports and assessments have been distributed amongst key humanitarian players in Nairobi. Additional copies have been dispatched to Khartoum for distribution amongst counterparts in the North.
Sudan Snapshots
A series of ‘snapshots’ have been produced by UNJLC. One-page executive summaries of the main UNJLC reports and areas of activity, they aim to provide an accessible overview of the key issues, and an introduction to the main UNJLC products.
The following Snapshots have been prepared:
- Fuel in Southern Sudan,
- Southern Sudan Air Operations
- GoS Towns in Southern Sudan.
Joint Assessment Mission
UNJLC participated in the Joint Assessment Mission – Cluster 8 (Information and Data) north-south meeting on Census Planning this week. The census is an integral part of the peace process. It must enable elections to take place in the third year of the interim period. For the census to occur in the south, it must firstly determine how many settlements there are and where they are located. Only then, can a census begin to plan to enumerate every household in the region. Current mapping efforts conducted by UNJLC and FAO are providing the starting point by which a comprehensive inventory of all settlements in Southern Sudan can be conducted..
ABOUT UNJLC
UNJLC is an inter-agency facility reporting, in the current emergency, to the Humanitarian Coordinator for Sudan, and overall to the Inter-Agency Standing Committee. Its mandate is to coordinate and optimize the logistics capabilities of humanitarian organizations in large-scale emergencies. UNJLC operates under the custodianship of WFP who are responsible for the administrative and financial management of the Centre. UNJLC is funded from voluntary contributions channelled through WFP. The UNJLC project document for Sudan can be viewed on the UNJLC website (www.unjlc.org )